# Resources

## Case Studies

**How TYCROP Solved Their Labor Shortage**  
"The robot can operate 24 hours a day. That’s scalability."  
[Read more](/content/case-studies/how-tycrop-solved-their-labor-shortage/index.html)

**Why a Wyoming Manufacturer Chose Path Over a Second Shift**  
More output, same team. Mine Rite is adding the capacity of a full second shift — without actually running one.  
[Read more](/content/case-studies/mine-rite-case-study/index.html)
